The London Taxi company has made a significant investment in a new state of the art factory in Coventry to build the nex generation of electric taxis. the building is nearing completion and Acis Energy was employed to design and install the PV system

The 95kW PV system for the London Taxi Companies new £350m factory in Coventry uses 365 Sharp 260w panels mounted on the roof using Renusol’s Metasole+  system.

The electrical installation also included the installation of a DC isolating Fireman’s switch which can be activated from the  main reception in the event of an emergency.